HUB (18)
SITE (20)
| <all other values> |
| In Building |
| Cell Site |
| Small Cell |
| UNK |
| HUB |
FieldNote (Point) (178)
| <all other values> |
| Water |
| Fire Hydrant |
| Gas |
| Power |
| Reclaimed Water |
| Storm Water |
| Telecom |
| Traffic Control |
| UNPS; Wastewater |
FieldNote (Line) (179)
| <all other values> |
| Open – Design |
| Open – Field |
| Closed - Field |
| Closed – Design |
FieldNote (Polygon) (180)
| <all other values> |
| Closed - Field |
| Closed – Design |
| Open – Design |
| Open – Field |
Address (31)
Guys (14)
| <all other values> |
| Existing |
| Proposed |
Building Outline (32)
Navigable Waterway (35)
Railroad (36)
Sewer Line (37)
Sidewalk (38)
Street Centerline (39)
Water Line (40)
CBD (41)
Historical District (42)
State Park (43)
ROW (44)
| <all other values> |
| No |
| Yes |
Parcel (45)
Flood Zone (46)
Wetland (47)
Muncipality (48)
County (49)
Route (50)
Utility Point (58)
| <all other values> |
| Fire Hydrant |
| Gas |
| Power |
| Pump Station |
| Reclaimed Water |
| Storm Water |
| Telecom |
| Wasterwater |
| Water |
Bore Pit (60)
County Water Points (61)
| Drainage |
| Hydrant |
| Waste |
| Water |
CRO Pole (70)
| <all other values> |
| Extensive Make Ready |
| Heavy Make Ready |
| Medium Make Ready |
| Light Make Ready |
| No Make Ready |
Submerged Lands (73)
MRE Assignment Polygon (76)
Work Order Area (77)
| <all other values> |
| Preliminary Design |
| Ready for CPD GDB |
| CPD GDB Submitted |
| Ready for RTC GDB |
| RTC GDB Submitted |
| Ready for As-Built GDB |
| As-Built GDB Submitted |
Work Area (89)
Easement (90)
Teco Poles (93)
FDA Area BV3GIS (140)
OLT-OSA Area (135)
| <all other values> |
| OLT |
| FDA |
ODN Handholes (143)
| ODN HH |
| PAD MOUNT |
BV_UTILITY_LINES (145)
| <all other values> |
| Comm |
| Electric |
| Gas |
| Reclaimed Water |
| Storm |
| Traffic Control |
| Wastewater |
| Water |
|